11:00 - 11:10 Dima has a mic fitting with Rob
11:10 - 11:20 Michael has a mic fitting with Rob
11:10 - 12:00 Ian and Dima talk about the leaning shoes
11:20 - 11:30 Elena has a mic fitting with Rob
11:30 - 12:00 Michael has a costume Fitting
11:30 - 11:40 Peter has a mic fitting with Rob
11:40 - 11:50 Melanie has a mic fitting with Rob
11:50 - 12:00 Massimo has a mic fitting with Rob
12:00 - 2:00 Mo and Sabine work Chaos with Full Cast and Russ (Elena you are not called for this rehearsal)
1:00pm Add the Full Band
2:00 - 2:30pm Denise has a costume fitting
2:00 - 2:15pm Rob has monitor check with band / cast take a break
2:15 - 5:00pm Begin at the top of the show with the full cast and band
5:00 - 6:30pm Dinner will be served at the tent
5:00 - 5:30pm Dima and Elena train at CTZ
5:30 - 6:00pm Denise and Massimo train at CTZ
6:00 - 6:30pm Svetlana, Peter and Dima train Puppet at CTZ
6:00 - 6:30pm Massimo has a costume fitting
6:30 - 11:00pm "Contine where we left off with teching the show before dinner
Called: Full Cast and Band"
Monday, May 4, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment