Monday, September 29, 2008

Monday Sept 29 - Wednesday Oct 1, 2008

Monday September 29, 2008

10:00 - 1:00pm Sam and Sandra Train in the tent

10:00 - 11:30 Durkee and Karl work with Sam on the Piano

1:00 - 4:00pm Semion Train in the tent

Tuesday September 30, 2008

1:00 - 4:00pm Semion Train in the tent

Wednesday October 1, 2008

10:00 - 1:00pm Sam and Sandra Train in the tent

2:30 - 3:30pm Erika and Andrew train at CTZ

3:30 - 4:30pm Semion train at CTZ

4:30 - 5:00pm Mat train at CTZ

4:30 - 5:00pm Heidi and Mo talk about notes from the show

5:00 - 5:30pm Bianca trian at CTZ

6:15pm House open

7:00pm Show

Sunday, September 28, 2008

Sunday - September 28, 2008

"REMINDER:
Folsom Street Festival is tomorrow. Folsom Street is closed from 7th st to 12th st. From 11am to 6pm"


3:50 - 4:10 Heidi and Niki work with Bianca and Andrew on the Bungee landing and out and Straps in

4:10 - 4:30 Mo work with Erika on the Raising Table

4:30 - 4:45 Norm work opening with Durkee, Rob, Robert, Erika, Andrew and Semion

5:15pm House Open

5:30pm Norm speak with the cast in the dressing room

6:00pm Show

Saturday, September 27, 2008

Saturday September 27, 2008

1:30 - 2:15 Robert, Heidi and Ritz have a meeting about Cabarets in October and November

2:00 - 2:15 Durkee work with the Full Band on Chaos thru end of show

2:00 - 2:50 Thelma has a costume Fitting

2:15 - 2:35 Mo work Bee Dance with Bianca, Mat and Full Band

2:35 - 2:50 Robert and Full Band work Opening of Show

2:50 - 3:00 Thelma runs Without you with the Full Band

3:00 - 3:10 Rob works with Thelma on Incantation Reverb

2:50 - 3:05 Bianca has a costume Fitting

3:00 - 3:30 Durkee works Georgia with Karl, Wil and John. Erika and Andrew called but not needed to go up on straps

3:30 - 4:00 Durkee works Aria and Italian Street song with Frank and Rachel

3:30 - 5:00 Christine has a costume fitting

4:00 - 4:30 Mo and Durkee work Juggling Act with Rachel, Semion and Full Band

4:30 - 5:00 Work the New Scene with Thelma, Mat, Rachel, Semion, Robert, Bianca, Erika, Andrew and Full Band, Durkee and Peter B

5:00 - 5:10 Rob works with Robert on Aztec Reverb

5:00 - 5:30 Durkee work PW with Frank and Christine

6:00pm One Hour

7:00pm Show

Friday, September 26, 2008

Friday September 26, 2008

1:30 - 2:30 Norm and Mo Work New Scene - Peter B, Durkee and Full cast minus Christine. This scene will go in on Saturday.

2:30 - 3:30 Norm and Mo redo the Opening of the show with the Full Band, Robert, Erika, Andrew and Semion

2:30 - 3:30 Bianca has a costume Fitting

3:30 - 4:00 Band work Georgia

3:30 - 4:00 Thelma and Robert work the mirror ball at CTZ

4:00 - 4:30 Band work with Thelma

4:30 - 5:30 Run Christine's Acts with the Band, Christine, Mat, Bianca, Rachel, Semion, Andrew and full tech

5:30 - 6:00 Thelma has a mic fitting with Rob

6:15pm House Open

7:00pm Show # 2

Thursday, September 25, 2008

Thursday September 25, 2008

1:20 - 2:20 Bianca has a costume fitting and she will be going up on her fabric as well for the costume pieces

2:20 - 2:45 Work Fellini in tent with Bianca, Mat, Rachel

2:20 - 2:45 Work chorerography One Monkey Thelma, and Christine in the lobby

2:45 - 3:15 Work Bianca's act intro with Bianca, Rachel, Mat, Erika, Andrew, Semion Full band, tech in tent

2:45 - 3:15 Notes in lobby with Norm, Thelma, Robert

3:15 - 3:45 Semion, Rachel talk with Norm, Mo and Nicole in lobby

3:15 - 3:45 Work Bianca's act with Bianca, Thelma, Full band, Niki, Mat, Heidi

3:45 - 4:00 Mat and Bianca get into costume for Bee dance

3:45 - 4:15 Rachel has a costume Fitting

4:00 - 4:30 Work Bee Dance with Mat, Bianca, Robert and Semion, full band and full tech


4:30 - 5:30 "Work put a little love with cast and band and waitstaff and then work mojo with
cast, waitstaff and band"

5:30 - 5:45 Christine has a mic fitting with Rob

5:30 - 5:45 Work Salad Samba with Full Cast minus Christine

6:00pm One Hour

7:00pm Opening Night

Wednesday, September 24, 2008

Wednesday September 24, 2008

REMINDER YOU WILL NEED YOUR PORT PASS TOMORROW TO GET INTO THE PARKING LOT. A CRUISE SHIP IS DOCKING AT 27.


12:00 - 12:30 Discuss new scene: Norm, Mo, Bianca, Mat, Erika, Andrew, Thelma, Robert

12:30 - 1:00 Thelma has a costume fitting

12:40 - 1:00 "Mo, Peter, Heidi
Clean Erika and and Andrews Intro and Hit the road Jack"

1:00 - 1:40 Norm, Mo, Bianca, Durkee, Karl, Frank, Heidi talk about cues in the show

1:40 - 2:10 "Work Bee Dance (mat's intro)
Called: Mat, Bianca, Semion, Robert, Full Band"

2:10 - 2:40 "Work Hit the Road Jack (bianca's intro)
Called: Bianca, Mat, Erika, Andrew, Rachel, Semion, Robert, Full Band"

2:40 - 3:10 "Work Opening to Mojo
Called: Erika, Andrew, Semion, Robert, Full Band"

3:10 - 3:40 "Work Juggling Intro
Called: Semion, Rachel, Andrew"

3:40 - 4:40 Christine has a costume fitting

3:40 - 4:10 "Work Juggling Act
Called: Semion, Rachel, Andrew, Mat, Bianca, Full Band"

4:10 - 4:40 "Tech Bianca's Act:
Bianca, Mat, Rachel, Semion, Erika, Andrew"

4:40 - 5:00 "Tech Rachel's Bird Cage:
Rachel, Semion, Bianca"

5:00 - 6:00 Dinner

6:00 - 7:00 Train Tech Waitstaff in tent / Cast One hour

7:00 - 11:00 Final Dress

Monday, September 22, 2008

Tuesday September 23, 2008

11:45 - 12:00 Rachel fitted for a mic with Rob

12:00 - 1:00 Bianca has a costume fitting

12:00 - 12:30 "Mo Tech Bird Cage
Called: Rachel, Semion, Niki, Paul and Heidi "

12:00 - 12:15 Thelma fitted for mic with Rob

12:15 - 12:30 Erika fitted for a mic with Rob

12:30 - 1:15 "Mo tech Bianca's Intro and Act
Called: Bianca, Andrew, Erika, Mat, Rachel, Semion, Niki, Paul and Heidi"

12:30 - 12:45 Robert fitted for a mic with Rob

1:00 - 1:30 Frank has a costume fitting

1:15 - 1:45 "Work Opening of show
Called: Robert, Erika, Andrew, Semion"

1:15 - 1:30 Mat has a mic fitting with Rob

1:15 - 1:45 Rachel has a costume fitting

1:30 - 1:45 Christine has a mic fitting with Rob

1:30 - 2:00 John has a costume fitting

1:45 - 2:45 "Work Christine's Acts
Called: Christine, Bianca, Mat, Rachel, Semion, Andrew, Full Band"

2:45 - 3:15 "Work Put a little love in your heart
Called Full cast and band"

3:15 - 3:30 Bianca in act costume with bed light session

3:20 - 3:40 Band Sound check with Rob and Full Band

3:40 - 5:00 "Work from the top of the show through the show
Called full cast and staff"

5:00 - 6:00pm Dinner provided at tent

6:00 - 11:00 Continue where we left off before dinner

Sunday, September 21, 2008

Monday September 22, 2008

9:00 - 12:30 Rigging

10:30 - 12:30 Peter and Heidi have a meeting

11:00 - 12:30 Mat has a costume fitting

11:00 - 12:00 Bianca, Niki and Patrice have rigging time

12:30 - 1:30 "Peter and Mo light Semion's Act
Called: Semion"

12:30 - 1:30 Bianca has a costume fitting

12:30 - 1:30 Mat work in the lobby

1:30 - 3:00 Peter, Mo and Bianca set lights for her intro and act

2:30 - 4:00 Christine has a wig fitting

3:00 - 3:30 Bianca and Mat work in the lobby on his intro

3:00 - 5:00 Peter and Mo start to light the show

3:30 - 4:00 Bianca, Erika and Andrew work in the Lobby

4:00 - 4:45pm Erika has a wig fitting

5:00 - 6:00 Dinner

6:00 - 6:45 Peter and Mo light Rachel and Erika and Andrew in costume

6:45 - 11:00pm Continue Lighting the show

Saturday, September 20, 2008

Sunday September 21, 2008

11:30 - 12:00 Bianca Train at CTZ

12:00 - 1:00 Christine work in the center

12:30 - 1:30 Mat work in the lobby with the hoops

1:00 - 1:30 Work Aztec with Mo and Durkee
Called: Robert, Rachel and Semion

1:30 - 2:00 Work Mat's Intro with Mo, Bianca, Durkee
Called: Bianca, Mat, Semion, Robert

2:00 - 2:30 Work Intro of Show with Norm, Mo and Durkee
Called: Robert, Andrew, Erika, Semion

2:30 - 3:00 Work Incantation with Mo and Bianca
Called: Thelma, Robert, Erika, Andrew, Semion, Rachel, Mat, Bianca

3:00 - 3:30 Work Bianca's Intro with Mo and Durkee
Called: Bianca, Mat, Rachel, Erika, Andrew, Semion

3:30 - 4:00 Work Hit the Road Jack with Mo and Durkee
Called: Bianca, Mat, Erika, Andrew, Robert, Rachel, Semion

4:00 - 5:00 Costume fitting with Marina
Called Erika

5:00 - 7:30 Costume fitting with Marina
Called Bianca

4:00 - 5:00 Prep tent for show

4:30 - 4:45 Elena Train at TZ

4:30 - 4:50 Audition on stage

4:45 - 5:00 Mickael and Gregory Train at CTZ

5:15pm House Open

7:30 - 9:00 Costume fitting with Marina
Called Mat

6:00 - 9:00 Final Show of Hail Caesar

Friday, September 19, 2008

Saturday September 20, 2009

9:00 - 10:00 Christine work in the space by herself

10:00 - 11:00 Semion Train at CTZ

10:00 - 12:00 Band Rehearsal with Durkee
Called: Full Band

11:00 - 12:00 Christine work at CTZ

11:30 - 12:00 Semion has a costume fitting

11:30 - 12:00 Norm work with Thelma and Robert on the Toast and VP in the lobby

11:30- 12:00 Work Juggling Act with Full band and Rachel

12:00 - 12:40 Thelma has a costume fitting

12:00 - 12:20 Durkee Work Georgia with Frank, John, Erika and Andrew

12:20 - 12:40 Durkee work with Robert

12:40 - 1:00pm "Mo, Norm work Toast into without you with
Called: Full Cast minus Mat"

1:00 - 2:00 "Mo work Bianca's Intro
Called: Mat, Rachel, Erika, Andrew, Bianca"

2:00 - 2:30 "Work Mat's intro with Durkee, Bianca, Mo
Called: Mat, Semion, Robert . Bianca"

2:30 - 3:00 "Work Hit the road Jack with Bianca, Mo, Durkee
Called: Robert, Semion, Rachel, Erika, Andrew, Mat, Bianca"

3:00 - 4:30 Mo Stage Chaos with full cast minus Mat and Production Staff

4:30 - 5:30 Mo stage and add waitstaff into chaos and work final song if time permits

5:30 - 6:30 Production Meeting

5:30 - 6:00 Erika has a wig fitting

6:00 - 6:45 Rachel has a wig fitting

6:45 - 7:30 Christine has a wig fitting

7:30 - 8:30 Bianca has a costume fitting

5:30 - 5:45 Elena Train

5:30 - 6:15 Prep tent for show

5:45 - 6:00 Greg and Mickael train

6:15 - 7:00 House Open

7:00 to 10:00 “Hail Caesar!” Cast and Crew

Wednesday, September 17, 2008

Friday September 19, 2008

11:00 - 11:30 Semion Train at CTZ

11:30 - 12:00 Mat train at CTZ

11:30 - 12:30 Heidi, Paul, Niki have a meeting

12:00 - 12:30 Bianca Train at CTZ

12:30 - 1:00 Tech Bungee with Mo at CTZ
Called: Bianca, Heidi, Niki and Paul

12:30 - 1:00 Semion - has a CF on unicycle

12:30 - 1:00 Karl and Frank work parts for I only have eyes for you
Called: Robert, Christine, Rachel and Mat

1:00 - 1:30 Intro to Mat music discussion wiith Mat, Durkee, Norm, Mo and Bianca

1:30 - 2:30 Norm, Durkee and Frank work Juliet
Called: Christine, Bianca, Rachel, Mat

2:30 - 3:30 Mo, Bianca, Durkee and Frank work Hit the Road Jack
Called: Rachel, Mat, Bianca, Semion, Erika, Andrew

2:30 - 3:30 Christine has a costume fitting

3:30 - 4:30 "Mo, Bianca and Durkee work Bianca's Intro
"
Called: Rachel, Mat, Erika, Andrew

4:30 to 5:00 Mo,Bianca Durkee, Karl and Frank Teach aztec with Robert
Called: Waitstaff, Rachel, Mat,

4:30 - 5:45 Mat has a costume fitting

5:00 - 6:00 Production Meeting
Called: Creative Team, Heidi, Paul, Niki

5:00 - 5:30 Elena Train at CTZ

5:00 to 6:00 Prep Tent for Show

5:45 - 6:00 Gregory and Mickael warm up at CTZ

5:45 - 6:30 Rachel has a costume fitting

6:00 to 7:00 House Open

6:30 - 7:30pm Bianca has a costume fitting

7:00pm Hail Caesar show begins

Thursday September 18, 2008

12:00 - 12:30 "Durkee work Madrigial Song in tent
called - Karl, Nadir, Mat, Rachel "

12:00 - 1:15 Semion has a costume fitting

12:30 - 1:15pm "Norm and Durkee work PW - in tent
Called - Christine, Mat , Rachel, Bianca "

1:15 - 2:00 "Norm and Durkee work VP - In tent
Called - Robert, Thelma, Christine, Mat, Bianca, Rachel, Semion, Andrew"

2:00 - 2:15 "Mo work Juggling Act - in tent
Called - Semion, Andrew, Rachel"

2:00 - 2:45 Thelma has a costume fitting

2:15 - 2:45 "Bianca work her outro - in tent
Called - Bianca, Erika, Andrew "

2:45 - 3:30 "Norm and Mo Stage motocycle and without you - In tent
Called - Thelma, Rachel. Semion, Erika, Andrew, Robert, Bianca "

3:30 - 4:30 "Durkee have full band rehearsal with Thelma
Called - Full Band and Thelma "

3:30 - 4:30 Christine has a costume fitting

3:30 - 4:30 "Bianca work Incantation Choreography in the lobby
Called - Bianca, Mat, Rachel "

3:30 - 4:00 Elena Train at CTZ

4:00 - 4:30 Mat Train at CTZ

4:00 - 4:30 "Bianca work choreography Act Intro in the lobby -
Called - Bianca, Erika and Andrew"

4:30 - 4:45 "Full Cast introduction with Waitstaff in tent
Called Full cast, Full Band"

4:45 - 5:30 "Bianca choreograph Mojo with Waitstaff, Andrew, Erika, Robert,
Semion in tent"

4:45 - 5:30 Rachel has a costume fitting

5:30 - 6:30 Production Meeting

5:30 - 6:00 Erika has a costume fitting

5:45 - 6:00pm Greg and Mickael train at CTZ

6:15pm House Open

6:30 - 7:30 Bianca has a costume fitting

7:00pm "Hail Caesar Show -
Hearts on Fire cast watch show"

Tuesday, September 16, 2008

Wednesday September 17, 2008

10:45 - 11:00 "Have honey comb mock up piece onstage for Norm to look at
The continue it."

11:00 to 12:00 Work Christine's VP in the tent with Norm and Durkee and Frank
Called: Christine and Mat

11:00 - 11:45 Work Bianca's Intro in the Lobby
Called: Bianca, Erika and Andrew

11:15 – 12:00 Costume Fitting
Called: Rachel

12:00 - 12:30 Erika and Andrew work with Durkee
Called: Erika and Andrew

12:15 to 1:00 Review PW with Norm and Durkee in the lobby
Called: Christine

12:30 - 1:00 "12:30 - 1:00 - Mo work Mojo in the tent
"
Called: Thelma, Robert, Erika, Andrew, Semion

1:30 to 2:15 Stage and put together End of VP into Audience Dance
Called: Christine, Mat, Erika, Andrew, Rachel, Semion, Thelma, Robert

2:15 – 3:30 Costume Fitting
Called: Christine

2:30 - 2:45 Bianca, Mo and Durkee have a discussion about walkaround music into Bianca's intro

2:45 - 3:15 Begin work on Walkaround through Bianca’s Intro
Called: Rachel, Erika, Bianca, Andrew, Mat and Semion

3:15 to 3:45 Bianca’s Outro with Mo
Called: Bianca, Erika, Andrew

3:30 – 4:30 Costume Fitting
Called: Thelma

3:45 to 4:00 Plate Dance
Called: Robert, Semion, Erika, Andrew, Bianca

4:00 to 4:30 Juggling Rehearsal
Called: Semion, Andrew and Rachel

4:30 – 5:30 Music Rehearsal on stage
Called: Mat

4:30 - 5:00 Costume Fitting
Called: Andrew

4:30 – 5:00 Elena Train at CTZ

5:00 - 5:30 Bianca Train at CTZ

5:30 – 6:30 Production Meeting
Creative Team, Heidi, Paul

5:30 – 6:30 Costume Fitting
Called: Mat

5:00 to 6:00 Prep Tent for Show

5:30 to 6:00 Radion Interview for Thelma

5:45 to 6:00 Warm Up
Called Greg and Mickael

6:00 to 7:00 House Open

6:30 to TBD Creative Meeting
Called: Norm, Mo, Bianca, Heidi

7:00 to 10:00 “Hail Caesar!”

Monday, September 15, 2008

Tuesday September 16, 2008

10:45 – 11:30 Wig Fitting in the costume Shop
Called: Christine

11:30 – 12:00 Wig Fitting in the costume Shop
Called: Rachel

11:30 – 12:00 Talk with Durkee about Act music
called: Erika and Andrew

12:00 to 1:00 Cast meeting with Betania
called: Full Cast

1:00 to 2:00 Chorograph Plate Dance in Lobby with Bianca and Mo
Called: Robert, Semion, Erika, Andrew, Bianca,

1:00 to 2:00 Penelope Wilde in the tent with Norm, Durkee and Frank
Called: Christine

2:00 to 2:45 Restage “Mojo” in the tent with Mo and Bianca and Durkee, Frank
Called: Full Cast minus Bianca, Rachel, Mat and Christine

3:00 to 4:00 Incantation & Felllini Moment in the tent
Called: Full Cast

4:00 - 5:00 Music Rehearsal – Juggling Music record - Durkee and Mo
Called Rachel

4:00 – 5:00 Costume Fitting
Called Bianca Part 1

5:00 to 6:00 Dinner Break

5:50 – 6:45 Costume Fitting
Called Bianca Part 2


6:00 to 6:45 Music Rehearsal – Juggling Music
Called: Rachel, Semion, Durkee, Frank, Mo, Heidi, Paul

6:45 – 7:45 Costume Fitting
Called Robert

7:00 to 8:00 Stage “Italian Street Song” into Juggling in the tent with Mo and Durkee
Called - Rachel, Semion, Erika, Andrew, Bianca, Mat

8:00 to 8:45 Stage Outro Juggling into Intro VP with Mo and Durkee
Called - Semion, Rachel, Bianca, Mat, Christine, Thelma, Robert

9:00 to 9:30 Production Meeting
Called - Creative Team, Heidi, Paul

9:30 to 10:30 Creative Meeting
Norm, Mo, Bianca, Heidi

Sunday, September 14, 2008

Monday September 15, 2008

11:30 – 1pm Costume Fitting in costume shop
Called - Christine Deaver

1:30 to 2:00 Meet & Greet in tent
Called - Cast, Directing Team, TZ Staff

2:00 to 2:30 Story Meeting inTent
Called Full Cast, Directing Staff, Heidi, Paul, Beaver in Tent

2:30 to 3:00 Story Discussions in tent
Called - Cast TBA, Norm, Mo, Heidi, Paul

3:00 – 4:00 Costume fitting in costume shop
Called - Thelma

3:00 to 3:30 Music Discussion with Durkee, Norm, Mo, Karl, Frank on stage in tent
Called - Robert, Heidi

3:30 to 4:00 Bed Discussion at CTZ with Mo and Shauna
Called - Bianca, Heidi, Paul

3:30 to 4:00 Music Rehearsal with Durkee, Norm, Karl, Frank on stage in tent
Called - Thelma and Heidi

4:00 to 4:15 Music Rehearsal with Durkee, Norm, Karl, Frank on stage in tent
Called - Thelma, Rachel, Heidi

4:00 - 4:45 Work Intro to Bianca's act with Mo and Norm
Called: Bianca, Erika, Andrew, Heidi, Paul

4:15 to 4:45 Music Discussion with Durkee, Norm, Karl, Frank on stage in tent
Called - Christine, Heidi

4:15 – 4:30 Costume fitting in costume shop
Called - Semion

4:45 to 5:00 Work Juggling Act with Mo, Norm, Durkee, Karl, Frank at CTZ in tent
Called - Semion, Rachel, Heidi, Paul

5:00 – 6:15 Costume fitting with Marina in costume shop
Called - Mat

5:00 to 5:30 Work and Discuss Juggling Music With Mo and Durkee, Karl, Frank in tent
Called Semion, Rachel, Heidi

5:00 to 5:30 Honeycomb Discussion in tent
called Norm, Shauna, Beaver, Paul

5:30 to 6:15 Discuss Fellini Music onstage in tent
called - Durkee, Norm, Mo, Bianca, Heidi, Karl, Frank on stage in tent

6:15 to 6:45 Discuss Music Choices with Durkee, Norm, Karl, Frank on stage in tent
Called Mat

6:15 – 7:15 Costume fitting with Marina in costume shop
Called - Rachel

6:30 to 7:00 Production Meeting in tent
Called - Creative Team, Karl, Heidi, Paul

7:00 to 9:00 Welcome Dinner for Creative Team, Cast, SF Production and Costumes dept in tent

If you have any questions please contact me on my cell 408-691-8207

Thanks,
Heidi

Saturday, September 13, 2008

Sunday September 14, 2008

2:45 - 3:45 Erika and Andrew train at CTZ

3:45 - 4:45 Elena train at CTZ

4:45 - 5:00 Gregory and Mickael train at CTZ

5:00pm One Hour

6:00pm Show

Friday, September 12, 2008

Saturday September 13, 2008

12:00 - 2:30 Domitil and Sam train at CTZ

3:00 - 3:45 Costume fitting for Andrew

3:45 - 5:15 Costume for Erika

4:30 - 5:30 Elena train at CTZ

6:00pm One Hour

7:00pm Show

Thursday, September 11, 2008

Friday September 12, 2008

11:30 - 12:30 Elena train at CTZ

12:30 - 1:30 Erika and Andrew train at CTZ

6:00pm One Hour

7:00pm Show

Wednesday, September 10, 2008

Thursday September 11, 2008

11:00 - 12:00 Elena train at CTZ

12:00 - 3:00 Sam and Domitil train at CTZ

3:45 - 4:15 Costume fitting for Andrew. Test with rigging at CTZ.

4:15 - 5:00 Costume fitting for Erika. Possibly test with rigging at CTZ

6:00pm One Hour

7:00pm Show

Sunday, September 7, 2008

Wednesday September 10, 2008

3:30 - 4:00 Tony and Matt rehearse at CTZ

4:00 - 5:00 Tony, Matt, and Full Band rehearse Duo Manducas

5:00 - 5:20 Tony, Andrew, and Matt rehearse fans for Queen of the Nile and end of show

5:20 - 5:40 Tony, Svetlana, Elena, Matt, and the Full Band rehearse Solo Mio

5:40 - 6:00 Full Cast rehearse Sarcophagus and the Mummy

6:00pm One Hour

7:00pm Show

Saturday, September 6, 2008

Sunday September 7, 2008

2:30 - 3:30 Erika and Andrew train at CTZ

3:30 - 4:00 Elena train at CTZ

4:30 - 5:00 Mickael and Gregory train at CTZ

5:00pm One Hour

6:00pm Show

Friday, September 5, 2008

Saturday September 6, 2008

11:30 - 1:30 Domitil and Sam train at CTZ

1:30 - 2:00 Elena train at CTZ

2:00 - 3:15 Costume fitting for Erika

3:15 - 4:00 Costume fitting for Andrew

3:00 - 4:30 Heidi, Tony, and Jennings work at CTZ

5:30 - 6:00 Mickael and Gregory train at CTZ

6:00pm One Hour

7:00pm Show

Thursday, September 4, 2008

Friday September 5, 2008

11:30 - 12:30 Erika and Andrew train at CTZ

12:00 - 3:00 Costume fitting for Bianca

12:00 - 1:00 Elena train at CTZ

5:45 - 6:00 Mickael and Gregory train at CTZ

6:00pm One Hour

7:00pm Show

Wednesday, September 3, 2008

Thursday September 4, 2008

12:00 - 1:00 Elena train at CTZ

1:00 - 2:30 Domitil and Sam train at CTZ

2:30 - 3:00 Bianca train at CTZ

3:00 - 5:00 Bianca, Erika, and Andrew rehearsing upcoming TZ show in tent

4:00 - 5:00 Production Meeting

5:00 - 5:30 Tech Bianca's act in the tent with full tech

5:30 - 6:00 Mickael and Gregory train at CTZ

6:00pm One Hour

7:00pm Show